Step by step
- Estimate and finish selection. The contractor measures, checks the existing finish and shows you samples.
- Draining (day 1). Done after checking groundwater conditions and the hydrostatic relief valve.
- Prep (days 1 to 3). The old finish is chipped, blasted or prepped down to a sound surface. Cracks are repaired, and tile, lights or fittings are replaced if included.
- Bond coat and finish (one day). The new finish is applied and troweled in a single day so it cures evenly.
- Refill (same day). Filling starts right away and should not stop until the pool is full.
- Start-up (about 1 to 2 weeks). Daily brushing and careful water balancing let the new finish cure without staining or scaling.
Living with the project
- Expect noise and dust during removal, usually a day or two.
- Equipment needs a path to the backyard; gates may need to be open.
- Pets and kids should stay out of the work area.
- Your water bill will reflect the refill. Some utilities offer a pool-fill adjustment; ask yours.
The part most people skip
Start-up matters more than anything else for how a new finish looks in five years. Ask your contractor who handles it, for how long, and what you're responsible for.
Frequently asked questions
How long until I can swim?
Many finishes allow swimming within a few days once the water is balanced, but follow your contractor's start-up instructions.
Should I resurface in summer or winter?
Cooler, drier months are often easier for curing and scheduling. Rainy season can bring delays and higher groundwater.